Conditions to be confirmed before implementation
The focus of the preparatory work was not on the first procurement of equipment, but on clarifying the target of assets, the management process and the physical environment.
- Combine Asset Register, asset classification and inventory range
- Identification of labeling conditions for surfaces of assets such as metals and plastics
- Clear business processes such as inventory, redeployment, loan and end-of-life
- Confirm data fields and interfaces of existing asset systems
Order of preparation of recommendations
- Select representative assets and areas for on-site testing
- Identification of labels, handheld terminals and data collection methods based on test results
- Clear implementation of scheduling, data initialization and acceptance criteria
The project cycle and budget would be better controlled by the completion of operational and on-site validation and the expansion of deployment.